5.18.2010

The Back-Fill Area

In case the foundation tour wasn't enough excitement for you, here are some pics of the latest. Deiter Construction did a great job on the walls.

To give you a reference point of the height the walls, I stepped in.

Here you can see the two rows of pads that the stilts (for lack of a better word) will be on. As mentioned before, the top level of the house will go above the foundation walls. This height will give us a street level driveway.

Prior to back-fill.

Next time don't be too cheap to pay the walls guys to take the plastic caps out of all the holes in the walls.

No comments:

Post a Comment