6.15.2010

The Framing - Lower Level II

I am here to report our lower level has a ceiling! Before and after:


Here is our future guest bedroom and bathroom, yet to be divided.

This room is our bonus room, under the garage, which will eventually have a bedroom in it as well. Check out Ty in action! This hole literally went to the crapper.

Ty had to get the sewage tank through here. It turned out to be a bit bigger than the windows. Modifications made in the field.

Looking good!

No comments:

Post a Comment